System engineering
Multipoint switching systems
Integration of multiple sample points to utilise a single analyser array. Consideration of actuation, bypass and timing of switching valves to permit the flow of sample gas. Coordination of dwell, sample and flushing times.
Switching systems
Where practical, the time sharing of analyser systems between multiple sample points can be an economical choice for measurement of a number of different process points. The need for heating will be determined by consideration of the process gas conditions and measurement performance goals. Simple heating, to avoid dew-point or to raise the system temperature above that which is influenced by the local environment, can be achieved by deploying self-regulating heaters and appropriate insulation. Regulated heating, and heating in ATEX zones, will require careful assessment of process requirements, temperature control and choice of materials to ensure availability and reliable operation. A heated sampling system is not an off-the-shelf product, and can only be offered through technical consultation.
Overview
The design of a successful switching system takes careful consideration in order to realise the anticipated cost savings and an understanding of analyser availability:
Sample points
Sample line & lag time
Switching valves
Pumps and bypass
Logic and control
Signal management
Calibration gas management

Documentation
Brochure
Request a quote
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.